Watertown remodelled this pool twice also. The first time we installed a 6′ straight walk in step, double aluminum track system and a new liner.
The second remodelling involved a sport pool conversion with a new liner. Our main focus on designing this bottom was to give the customer as much surface floor area as possible in the deep end of the pool. We could not simply bring the depth up. The old vermiculite bottom had to be removed and we had to change the angle of the floor to give the customer the most surface area.
Watertown installed a drain pipe 12″ below floor height with a submersible pump to keep the ground water down as we worked. We had a lot of rain to contend with during this job and the customers were extremely patient and very helpful with the complete job. It’s a pleasure doing work for these customers.