Road Clean-Up at Opening

These pictures show the way another company left the road and sewer drain after an opening they completed. Watertown feels this is our responsibility to clean up after we open a swimming pool.

We would never leave this mess in front of our customer`s house or their neighbors. If we are opening a pool with a lot of leaves, Watertown will leave one of our employees at the road just to keep the drain clear during the draining of the cover. Then he will sweep the road, drain, and bag up any debris.

This is what we consider finishing a job properly.

  • ;JK;JH;IKH
  • EEEEE
  • GJDJDGJ
  • GSGSGSG
  • HOYHOHO
  • KHKHKH
  • KKHKH
  • LTULTUL
  • UTLTULTUL